Skip Navigation

Appvion Paper Mill, Roaring Spring, PA

Project Description

Liability transfer of the former paper mill and 350 acres which serviced the mill.

Built atop halter creek and the in intersecting town stream 250’ tall recovery boiler building is the peak of the facility.

  • Asbestos Removal
  • Sludge pond closure and removal
  • Trout stream protection
  • Black liquor residual removal
  • Removal of hazardous waste
  • Universal Waste Removal
  • Demolition
  • Excavation to stabilize stream bank protection

Project Info

  • Client: Safegate
  • Services: Excavation, Demolition, Hazard Abatement / Environmental Remediation
  • Cost: $4,500,000